Skip Navigation Website Accessibility
Like us...Dooley Park       
Like us...Haunted House  
Like us...Downs Events    
 
  Search Site
 

6/4/2015: 2000 E (Huff Rd) Road Work and Closure Information


Beecher Trails road resurfacing:  Construction crews have have encountered some soft soils at the north entrance into the subdivision (intersection of Raef Road and 2000 East).  They have over excavated the soft spots, installed oversized rock and a drainage tile and the area is still soft.  They are looking into other options on correcting this issue and why 2000E is only half finished at the moment and remains closed.

Please do not drive around, remove or move any barricades on this road as this is a violation of State Motor Vehicle Code regarding traffic control devices.